BUILDING GUIDELINES

STEP 1

Obtain a building permit. Start this process by contacting one of the following planning and building departments:

You will need to get a permit and a plat or sketch of the proposed location. This plat should show lot boundaries, dimensions, easements, building setback requirements, water supply systems, sewage disposal systems, drainage systems, waterways, street or road name and location to which the property has access, and by plans and specifications showing the work to be done. Check with your county for a complete listing.

STEP 2

Call our engineering department. You will need to call 317-745-5473 or email eandoadmin@hendrickspower.com for an appointment to meet with us at the building site. The building and drive should be staked out before a visit can occur. We will determine where the electric service lines will be located, whether they will be installed overhead or underground and what fees may apply. Please refer to our LINE EXTENSION COST COST FOR SINGLE PHASE or LINE EXTENSION COST FOR THREE PHASE. The building should be staked out and you should know the size of service needed at the time we meet. You or your qualified electrician should determine the size. Meter base locations on all new home construction are restricted to the NEAREST POINT OF CONTACT to Hendricks Power facilities. By calling, you can also arrange for TEMPORARY SERVICE for the construction phase, if needed.  There is a $50.00 charge for this temporary service. Please adhere to our LOCATION REQUIREMENTS for temporary service. 

STEP 3

Turn in any necessary paperwork that was given to you at the time of your appointment. A copy of your warranty deed must be included with your signed/notarized UTILITY LINE LOCATION EASEMENT. The deed holder must be the person on the easement form. This must be done before construction is scheduled. If you are having your service put underground, most likely, you will sign the UNDERGROUND SERVICE RULES AND REGULATIONS FORM at your appointment. You will also complete an “Application for Membership and for Electric Service card.”  This application card explains the $20.00 refundable membership fee.

STEP 4

You are required to purchase one of our ACCEPTED METER BASES or purchase one from our office and have it installed. You or your electrician can pick up the meter base at our Avon office at 86 N. County Road 500 E during normal business hours Monday-Friday, 7:30 a.m. – 4:30 p.m. The top of the meter base shall not be more than six (6) feet or less than four (4) feet above final grade.

STEP 5

Call for an approval inspection. You or your electrician will do this after the building’s electric service panel has been connected to the meter base. Here are the numbers for the appropriate inspectors:

The inspector will then contact Hendricks Power and give approval to connect the permanent electric service. You may call the co-op when it is time for the permanent service, but the final “Tag” electric inspection must be completed.

FINAL STEP

Make sure we have your correct billing name and official address. This address will be issued to you by the permitting office. You are now a member-owner of Hendricks Power Cooperative!

CONTACT US TODAY

If you are a member of the media, please use the contact information under "Media Inquiries" below.

PHONE:

317-745-5473
800-876-5473

FAX:

317-745-6865

MAILING ADDRESS:

PO Box 309
Danville, IN

STREET ADDRESS:

86 N County Road 500 E
Avon, IN 46123

MEDIA INQUIRIES:

WE CARE ABOUT SAFETY

Call-811-Banner-300x250.jpg

 

GET A FREE ENERGY AUDIT!

Are you looking for ways to make your home more energy efficient? Whether you're building a new home or simply replacing your water heater, our energy advisors are ready with information, answers and advice. Call us today at (317) 745-5473. 

Co-op Connections Card

Co-op Connections Card